A quarterly review is a practical organisational routine. Whether data scrubbing is supported and how often it should run depend on the NAS, file system and storage configuration.
Rhythm: Quarterly as a planning review; actual schedules depend on the NAS and storage setup.
Context: This check interval is an editorial planning suggestion from ago52. Manufacturer requirements, visible problems and necessary earlier action take priority.
Why this task is useful
Reviewing the configured plan is different from imposing a universal quarterly technical deadline.
What happens if I do not review the NAS data-checking plan?
Possible consequences, faults and damage:
- A stopped or failed data check may go unnoticed.
- Detectable data inconsistencies may be discovered later.
Data scrubbing supports only certain file systems and RAID configurations. It neither prevents disk failure nor replaces backup.
Practical steps
- Read the help for the installed system version and storage type.
- Review existing plans and selected targets.
- Check completed runs and errors.
- Resolve findings using the documentation or qualified support.
What changes the rhythm
Do not start arbitrary repair operations on a damaged array. A plan review replaces neither independent backups nor restoration planning.
A common everyday question
Does RAID or data scrubbing replace a backup?
No. Integrity checks, redundancy and a separate backup serve different purposes. Check pool support and checksum settings, and review backups independently.
Remember next time
Create the task “Review NAS maintenance and scrubbing plans” in ago52. Save the system version, plan location and result, without NAS passwords. ago52 does not execute NAS checks.
Sources and context
Synology — original product guidance · Synology — original product guidance · Synology — original product guidance.
Care references researched on October 18, 2026; consequences, warning signs and additional questions reviewed on October 19, 2026. This English edition follows the same references as the German guide; some linked manufacturer pages are in German. General organisational consequences are editorial context. One symptom does not prove a defect.
The linked information supports care or operation guidance. The planning interval suggested by ago52 is not a universal manufacturer deadline.